ASME NQA-1 2008 PDF

Buy ASME NQA Quality Assurance Requirements For Nuclear Facility Applications from SAI Global. ASME NQA-1– (Revision of ASME NQA-1–). Quality. Assurance. Requirements for. Nuclear Facility. Applications. AN AMERICAN NATIONAL. American Society of Mechanical Engineers (ASME) NQA (95 addenda) and editions. The requirements of these documents shall be complied with .

Author: Yom Faeran
Country: Guinea-Bissau
Language: English (Spanish)
Genre: Finance
Published (Last): 3 December 2010
Pages: 345
PDF File Size: 6.59 Mb
ePub File Size: 20.65 Mb
ISBN: 192-7-89427-311-8
Downloads: 57415
Price: Free* [*Free Regsitration Required]
Uploader: Dojin

Source verification shall be implemented in accordance with plans to perform inspections, examinations, or tests at predetermined points. The program shall provide for the planning and accomplishment of activities affecting quality under suitably controlled conditions.

The calibration method and interval of calibration shall be based on the type of equipment, stability characteristics, required accuracy, intended use, and other conditions affecting performance.

The authority for application and removal of tags, markings, labels, and stamps shall be specified. Measuring and test equipment and reference standards submitted for calibration shall be checked and the results recorded before any required adjustments or repairs are made. An all-inclusive term used in place of any of the following: The extent of application is to be determined by the organization imposing the Standard.

Controls shall provide for identification, documentation, evaluation, segregation when practical, and disposition of nonconforming items, and for notification to 20088 organizations.

The cleanness class or classes applicable to the item or specific parts of the item shall be established qsme specified in the applicable drawings, specifications, or other appropriate documents.

The procurement requirements identified shall include any approved changes, waivers, or deviations applicable to the subject material or equipment. The organization shall establish and implement processes to detect and correct quality problems.

Nonconformances to design requirements dispositioned use-as-is or repair shall be subject to design control measures commensurate nqw-1 those applied to the original design. Critical characteristics to be verified are those that provide reasonable assurance that the item will perform its intended function. Control of the Use of Handling Equipment. Measuring and test equipment shall be suitably marked, tagged, labeled, or otherwise identified to indicate calibration status and establish traceability to calibration records.

The extent to which this Standard nsa-1 be applied will depend upon the specific type of nuclear facility, items, or services involved and the nature and scope and the relative importance of the activities being performed. Data Analysis and Evaluation.

  ANATOMI ATLASI PDF

Facilities used for dual storage are not required to satisfy the requirements of para.

Lead Auditors shall maintain their proficiency through one or more of the following: Quality assurance records shall be identified, generated, authenticated, and maintained, and their final disposition specified.

The item shall be flushed at the design velocity or other flow velocity if specified in the procedure until the screen shows no more than slight speckling as specified in the procedure in qualitative or quantitative terms, such aame the number of particles per unit surface of the screen and no more than slight rust staining.

The program shall provide control over activities affecting quality to an extent consistent with their importance. The evaluation shall include facility configurations that occur during operation, maintenance, test, surveillance, and inspection activities. Prospective Lead Auditors shall pass an examination aame shall evaluate comprehension of and ability to apply the body of knowledge identified above.

NQA-1 Compliance for Nuclear Power Generation

The need for, and level of detail in, written procedures or instructions shall be determined based upon complexity of the task, the significance of the item or activity, work environment, and worker proficiency and capability education, training, experience.

NSL has established itself as a proven provider of reliable material testing services. Audit responses shall be evaluated by or 22008 the auditing organization. March 14, The edition of this Standard is being issued with an automatic addenda subscription service.

NQA-1 – Wikipedia

Auditors shall have, or be given, appropriate training or orientation to develop their competence for performing audits. The application of this Part, or portions thereof, shall be invoked by written contracts, policies, procedures, specifications, or other appropriate documents.

In all cases the design verification shall be completed prior to relying upon the component, system, structure, or computer program to perform its function. Operating modes and environmental conditions shall be considered in determining the most adverse conditions.

These stages are siting, design, construction, operation, and decommissioning. Such documents, including changes thereto, shall be reviewed for adequacy and approved for release by authorized personnel.

The word should denotes guidance; the word shall denotes a requirement. These instructions, procedures, or drawings shall define the following, as applicable: If during this evaluation or at any other time, it is determined by the responsible organization that the capabilities of an individual are not in accordance with the qualification requirements specified for the job, that person shall be removed from that nwa-1 until such time as the required capability has been demonstrated.

  AVISHAI COHEN SONGBOOK PDF

The requirements for gaseous fluids used for flushing are dependent upon the particular item being flushed. Send Us a Request! Status shall be maintained through indicators, such as physical location and tags, markings, shop travelers, stamps, inspection records, or other suitable means.

WJE Compliant with ASME NQA-1 Nuclear Regulatory Standard | News | WJE

Computer program testing shall be performed and nqq-1 be in accordance with Requirement Part II contains quality assurance requirements for the planning and conducting of the fabrication, construction, modification, repair, maintenance, and testing of systems, components, or activities for nuclear facilities.

Receipt controls shall provide a method for identifying aame records received, receipt and inspection of incoming records, and submittal of records to storage.

In addition to the requirements of para. An audit should not be confused with surveillance or inspection activities performed for the sole purpose of process control or product acceptance.

Software design verification shall be performed by a competent individual s or asje s other than those who developed and documented the original design, but who may be from the same organization. Such oxides may vary in color from red to black and may form anything from a loosely adherent heavy covering to a tightly adherent light film. Such control shall provide axme the following as appropriate: Users of a code or standard are expressly advised that determination of the validity of any such patent rights, and the risk of infringement of such rights, is entirely their own responsibility.

This plan shall identify the audit scope, requirements, audit personnel, activities to be audited, organizations to 208 notified, applicable documents, schedule, and written procedures or checklists.

The designee shall be responsible for organizing and implementing receipt controls for permanent and temporary storage.